CPM Scheduling

See the News section for a list of current on-going schedules.

Recently Completed Schedules:
     $1.6M, Young Israel of Harrison, NY
     $30.2M, Brookfield Steel Recycling Plant, NY
     $2M, Branchburg Municipal Building, NJ
     $14M, Morris Heights Senior Housing, NJ
     $11M, Post Graduate Center for Mental Health, NY
     $5M, Norfolk Light Rail Service
     $30M, 50,000sf Data Center, TX
     $30M, 50,000sf Data Center, Sterling, VA
     $30M, 50,000sf Data Center, Santa Clara, CA
     $30M, 50,000sf Data Center, Atlanta, GA
     $9.2M, Dickerson Elem School, NJ
     $5M, Montclair Parking Garage, NJ
     $16.65M, Magazine Street, 139,000sf Mixed-Use Condos, NJ
     Newark Beth Israel, Renovation of OR Suite, NJ
     NJ Transit, Track 8
     Clara Maas Medical Center, Cath Lab, NJ
     Monmouth Medical Center, 4-phase ER Department, NJ
     US Army Corp of Engineers, Defense District Depot, PA

 

To accurately track projects from start to finish and analyze potential pitfalls, PCM provides CPM scheduling using Primavera P6, Suretrack and MS Project for General Contractors, Owners, Subcontractors and Architects.

Our broad experience includes, but is not limited to:

Military:

  • USACE Cost and Activity Loaded. SDEF Conversion for upload to RMS/QCS system.
  • VA Administration, Cost and Activity Loaded, including all required narratives and reports.

Fast Track:

  • Data Centers, Health Care, Educational projects to be completed over break periods required weekly updates and coordiation with multiple stakeholders.

Public Works:

  • Analysis of Critical Paths to ensure project is completed within required duration.

Recovery Schedules:

  • Re-draft entire scheudle relying on resource assignment and leveling to determine level of effort required to reduce duration.

Design / Build:

  • Conceptual, DD, Progress and Construction Schedules.

Claims:

  • Analysis of delay and determination of liability. Expert witness, mediation, arbitration and trial. Change order and insurance claim negotiation.

Risk Analysis:

  • Determine scheduling pitfalls, positive and negative float, necessary and unnecessary logic to report risk of meeting project milestones and completion.